Back To Glossary
Name:
Applies Technical Design Methods
Acronym:
Type:
Competency Set 64
Parent Element
Design
Child Competency Unit
Evaluate materials for multi-storey buildings
Evaluate services layout and connection methods for the planning of large building projects
Develops engineering solutions
Interprets and scopes design requirements
Determines engineering requirements
Designs / develops materials / components / components / systems
Defines processes to components / systems operation
Manages the uses of materials / components / systems within the outcomes of the project / operation
Manages the recovery, reuse and disposal of materials / components / systems
Use factors
Stress-strength analysis
Tolerance and worst-case analyses
Robust-design approaches
Design for X (DFX)
Parts selection
Material selection and control
Derating methods and principles
Availability tradeoffs
Supervise and apply quality standards to the selection of building and construction materials
Assess timber framed designs for one and two storey buildings
Assess structural requirements for domestic scale buildings
Assess the construction of buildings up to three (3) storeys
Evaluate services layout and connection methods for residential and commercial buildings up to 3 storeys
Assess structural requirements for buildings up to 3 storeys
Design residential and domestic fire sprinkler systems
Establish the gas management system
Establish the gas drainage management plan
Establish the outburst management plan
Establish the mining method and strata management systems
Establish mine transport systems and production equipment
Establish mine services and infrastructure systems
Select and install quarry plant and equipment
Establish quarry development
Establish the water management system
Design processing plant
Establish waste and by-product management system
Establish the stockpile management system
Prepare basic engineering drawing
Select and test mechanical engineering materials
Select and test mechatronic engineering materials
Assist in the preparation of a basic workplace layout
Select and test components for simple electronic switching and timing circuits
Establish and maintain the mine electrical installations, reticulation and protection systems
Establish waste and by-product management system
Establish mine services system
Establish the mine infrastructure and fixed plant systems
Redesign & develop modifications to apparatus & systems" circuits
Redesign & develop modifications to apparatus & systems" circuits
Redesign & develop modifications to apparatus & systems" circuits (Electronics)
Redesign & develop modifications to apparatus & systems" circuits (Instrumentation)
Redesign & develop modifications to apparatus & systems" circuits (Refrigeration & a/conditioning)
Design & develop modifications to explosion-protected equipment (Ex mixed)
Design & develop modifications to explosion-protected equipment (Ex p)
Design & develop modifications to explosion-protected equipment (Dip)
Design & develop modifications to explosion-protected equipment (Ex n)
Design & develop modifications to explosion-protected equipment (Ex i)
Design & develop modifications to explosion-protected equipment (Ex e)
Design and develop modifications to explosion protected equipment
Design and develop modifications to explosion protected equipment
Design electrical installations in hazardous areas (Ex mixed)
Design electrical installations in hazardous areas (Ex p)
Design electrical installations in hazardous areas (Dip)
Design electrical installations in hazardous areas (Ex n)
Design electrical installations in hazardous areas (Ex i)
Design electrical installations in hazardous areas (Ex e)
Design electrical installations in hazardous areas
Design electrical installations in hazardous areas
Design explosion-protected electrical systems (Ex mixed)
Design explosion-protected electrical systems (Ex p)
Design explosion-protected electrical systems (Dip)
Design explosion-protected electrical systems (Ex n)
Design explosion-protected electrical systems (Ex i)
Design explosion-protected electrical systems (Ex e)
Design explosion protected electrical systems
Design explosion protected electrical systems
Select and install surface mine plant and equipment
Design stockpile formations and reclaiming systems
Develop, implement and maintain process control systems
Establish the mine infrastructure and fixed plant systems
Establish the mine water management system
Establish the stockpile management system
Establish waste and by-product management system
Establish surface product haulage and transport systems
Establish the ventilation management system
Establish ventilation management system
Establish underground product haulage and transport systems
Prepare basic engineering drawing
Design distribution and collection systems
Select and prepare materials
Select and prepare materials
Design equipment and system modifications
Prepare basic engineering drawing
Design equipment and system modifications
Select and prepare materials
Design and prepare models, moulds and dies
Choose materials for an application
Design structural/mechanical components
Design and manufacture glass apparatus and glass systems
Prepare detailed design of rural roads
Prepare detailed design of urban roads
Prepare detailed design of busways
Prepare detailed design of motorways and interchanges
Prepare detailed design of rail civil infrastructure
Prepare detailed design of airfield civil works
Select pavement surfacing
Prepare detailed design of traffic signals
Prepare detailed design of traffic management systems
Prepare detailed design of underground services
Prepare detailed design of surface drainage
Prepare detailed design of subsurface drainage
Prepare detailed design of tunnels
Prepare detailed design of civil concrete structures
Prepare detailed design of civil steel structures
Prepare detailed design of civil timber structures
Prepare detailed design of civil masonry, crib and gabion structures
Prepare detailed design of marine structures civil works
Prepare detailed design of foundations
Prepare detailed design of canals
Design overhead distribution systems
Design underground distribution systems
Design distribution substations
Design public lighting systems
Design zone substation modifications
Design customer substation
Design transmission, sub-transmission and zone substation buildings
Design transmission, sub-transmission and zone substation primary plant
Design transmission, sub-transmission and zone substation protection and control systems
Design transmission, sub-transmission and zone substation earthing
Design transmission, sub-transmission and zone substation civil and structural components
Design overhead transmission systems
Design underground transmission systems
Determine whether hardware and software elements that satisfy the design and interface criteria are available~off-the-shelf.
Evaluate alternative design solutions, modelling them to a level of detail that permits comparison against the~specifications expressed in the system requirements and the performance, costs, time scal
Define and document the interfaces between system elements and at the system boundary with external~systems.
Stress-strength analysis
Definition:
Applies proprietary, generic or internal decision making techniques for the physical attributes of physical assets or their components.
Resource:
Comment:
Not comment.
Add Comment:
Please
Login
to leave a comment.