Identify the constraints on the design arising from the integration strategy.
Systems Engineering
|
Construction
|
Develops Construction Processes and Procedures
Heading:
5.5.6 Integration Process
Reference:
Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:
N/A
Scheme:
AS15288