Competency Units in Element:

Create/Dispose

Acquire the enabling systems or services to be used during disposal of a system.
Systems Engineering | Create/Dispose | Allocates Resources to Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Manage the implementation of decommissioning, disposal and risk control actions.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Deactivate the system to prepare it for removal from operation.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Withdraw operating staff from the system and record relevant operating knowledge.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Disassemble the system into manageable elements to facilitate its removal for reuse, recycling, reconditioning,~overhaul, archiving or destruction.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Remove the system from the operational environment for reuse, recycling, reconditioning, overhaul or~destruction.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Conduct destruction of the system, as necessary, to reduce the amount of waste treatment or to make the~waste easier to handle.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Manage well completion and abandonment
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:DRT03 Drilling Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/DRT03 Drilling Training Package/unit/DRTOG45B
Communicate unavoidable constraints on the system design arising from the disposal strategy.
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Confirm that no detrimental health, safety, security and environmental factors exist following disposal.
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Make sure assets are disposed of responsibly and ethically
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Define a disposal strategy for the system, to include each system element and any resulting waste products.
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
take account of the health, safety, security and privacy applicable to disposal~actions and to the long term condition of resulting physical material and information.
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Identify and plan decommissioning, disposal and risk control actions
Systems Engineering | Create/Dispose | Plans Asset Disposal Work
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Specify containment facilities, storage locations, inspection criteria and storage periods if the system is to be~stored.
Systems Engineering | Create/Dispose | Plans Asset Disposal Work
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288