Competency Units in Element:

Concept Exploration and Validation

Identify requirements for management strategies for verification and validation
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:Manage verification and validation processes
Reference:Government Skills Australia, Defence Materiel Logistics, http://www.governmentskills.com.au/content/view/665/
Scheme:Defence Materiel Logistics
Review and analyse production trials and specify retrials
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMBTECH502A
Review and analyse production trials and specify retrials
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMBTECH502A
Assist with analysis of emerging technology
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PSP04 Public Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PSP04 Public Sector Training Package/unit/ICAITS035C
Assist with analysis and use of emerging technology
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:SRC04 Community Recreation Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/SRC04 Community Recreation Industry Training Package/unit/SRXTCN001A
Review reliability of equipment and adjust reliability strategy
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:3.0 Equipment Reliability
Reference:SMRP M&R Knowledge Committee, Body of Knowledge Survey and Professional Development Worksheet, http://www.zoomerang.com/Survey/survey-intro.zgi?p=WEB2276UJHDAMY, Accessed 2/06/2008#http://SMRP M&R Kno
Link:N/A
Scheme:CMRP (Certified Maintenance and Reliability Professional)
Make effective use of "lessons learned" information
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 3.3 Maintain Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Review asset performance and capacity against current requirements to identify proposals for rationalisation of asset
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 3.4 Asset Optimisation and Rationalisation
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Identify improvements to working practices and procedures
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.2 Assess and Manage Risks
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Identify and correct any failures to meet requirements
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.4 Audit and Review Compliance with Legal, Regulatory, Ethical and Social Requirements
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Identify reasons where requirements are not met and adjust policies and procedures accordingly
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.4 Audit and Review Compliance with Legal, Regulatory, Ethical and Social Requirements
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Customer needs assessment
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:I. Reliability Management A. Strategic management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Identify and respond to problems and changes
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Manage and monitor technical data and information systems
Reference:Government Skills Australia, Defence Materiel Logistics, http://www.governmentskills.com.au/content/view/665/
Scheme:Defence Materiel Logistics
Identifies constraints on potential engineering and cultural issues with the proposed engineering solutions
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:C1: Engineering Practice
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Draws conclusions and makes recommendations
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E4B: Investigation and Reporting
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Identifies opportunities for new or improved processes and / or products
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Identifies the resources required for the R & D lines
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Initiates concept development
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Gains commitment to the R & D proposal
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
How to react to predictive alarms
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:6. Predictive Maintenance Management
Reference:Horselenberg M, R 2008, MMP - The PEMAC commitment to World Class Industry in Canada, Proceedings of Euromaint 2008, 8-10 April 2008, European Federation of National Maintenance Societies, Brussels, p
Scheme:Maintenance Management Professional (MMP)
Analyze the integrity of the system requirements to ensure that each requirement, pairs of requirements or sets~of requirements possess overall integrity.
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:5.5.3 Requirements Analysis Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Determine the appropriate course of action when corrective action is required to remedy failings due to~changed need.
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Accelerated life tests (e.g., single-stress, multiple-stress, sequential stress)
Systems Engineering | Concept Exploration and Validation | Applies Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Qualification/demonstration testing (e.g., sequential tests, fixed-length tests)
Systems Engineering | Concept Exploration and Validation | Applies Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Ensures research is undertaken
Systems Engineering | Concept Exploration and Validation | Applies Research
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Collaborates in the commercialisation of research outcomes
Systems Engineering | Concept Exploration and Validation | Applies Research
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Part count predictions and part stress analysis
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:IV. Reliability Modeling and Predictions B. Reliability predictions
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Elements of a reliability test plan
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Types and applications of reliability testing
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Test environment considerations
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Step-stress testing (e.g., HALT)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Reliability growth testing (e.g., Duane, AMSAA, TAAF)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Software testing (e.g., white-box, fault-injection)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Product reliability acceptance testing (PRAT)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Stress screening (e.g., ESS, HASS, burn-in tests)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Attribute testing (e.g., binomial, hypergeometric)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Degradation testing (e.g., Arrhenius)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Software testing (e.g., black-box, operational profile)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Define criteria for identifying and evaluating investment options
Systems Engineering | Concept Exploration and Validation | Develops Investment Options Strategies
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Identify and appraise investment options for achieving the AM Strategy
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Select investment options and develop business cases
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Decide between investment options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Develop investment plans
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Analyse and benchmark the costs and benefits of investment options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 2.5 Apply Whole Life Costing Principles
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Assess the costs, risks and benefits of competing asset creation and/or acquisition options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Appraise and prioritise investment projects based on their total business impact.
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Prepare business cases which identify and compare the costs, benefits and risks of proposed solutions based on the AM Plan.
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements