Competency Units in Element:

Operations Management

The staffing strategy and schedules for operators. 3) Where appropriate, the release and~re-acceptance criteria and schedules of the system to permit modifications that sustain existing or enhanced se
Operations and Maintenance | Operations Management | Allocates Resources to Operations Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Assign trained, qualified personnel to be operators.
Operations and Maintenance | Operations Management | Allocates Resources to Operations Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Develop appropriate implementation plans and targets in line with operations and maintenance strategy.
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:Unit 3.2 Operate Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Manage rig move and camp move
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:DRT03 Drilling Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/DRT03 Drilling Training Package/unit/DRTOG43B
Manage utilities and energy for a production process
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:FDF03 Food Processing Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/FDF03 Food Processing Industry Training Package/unit/FDFTECUTE5A
Manage water treatment processes
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:FDF03 Food Processing Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/FDF03 Food Processing Industry Training Package/unit/FDFTECWTP4A
Manage water system start-up
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:FPP01 Pulp And Paper Manufacturing Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/FPP01 Pulp And Paper Manufacturing Industries Training Package/unit/FPPWAS1A
Manage pre- and post-flight actions
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:TDA03 Aviation Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/TDA03 Aviation Training Package/unit/TDAW103A
Manage transmission networks
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO11A
Manage transmission network demand
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO12A
Activate the system in its intended operational situation to deliver instances of service or continuous service~according to its intended purpose.
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Consume materials, as required, to sustain the services.
Operations and Maintenance | Operations Management | Applies Operations Management Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Develop HV switching schedule
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRIS08A
Develop LV distribution switching programs
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO06A
Develop HV distribution and sub transmission switching programs
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO07A
Understand the applicable processes
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:2.0 Production Process Reliability
Reference:SMRP M&R Knowledge Committee, Body of Knowledge Survey and Professional Development Worksheet, http://www.zoomerang.com/Survey/survey-intro.zgi?p=WEB2276UJHDAMY, Accessed 2/06/2008#http://SMRP M&R Kno
Link:N/A
Scheme:CMRP (Certified Maintenance and Reliability Professional)
Develop operations workplans
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:Unit 3.2 Operate Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Develop H.V. Switching Programs
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS428A
Develop HV and LV distribution protection systems
Operations and Maintenance | Operations Management | Develops Operations Processes and Procedures
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS13A
Prepare a strategy for operation.
Operations and Maintenance | Operations Management | Develops Operations Strategies
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Review pre-installation fire safety system documentation
Operations and Maintenance | Operations Management | Maintains Operating Documentation
Heading:PRM04 Asset Maintenance Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PRM04 Asset Maintenance Training Package/unit/PRMFSSI03A
Maintain processes in accordance with applicable standards and regulations
Operations and Maintenance | Operations Management | Manages Operations Management Processes and Procedures
Heading:2.0 Production Process Reliability
Reference:SMRP M&R Knowledge Committee, Body of Knowledge Survey and Professional Development Worksheet, http://www.zoomerang.com/Survey/survey-intro.zgi?p=WEB2276UJHDAMY, Accessed 2/06/2008#http://SMRP M&R Kno
Link:N/A
Scheme:CMRP (Certified Maintenance and Reliability Professional)
Manages the processes within the operation / system
Operations and Maintenance | Operations Management | Manages Operations Management Processes and Procedures
Heading:E2: Engineering Operations
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Plans operations and systems
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:E2: Engineering Operations
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Design surface blasts
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS511A
Plan pit development
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS601A
Plan the Access Network
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:ICT02 Telecommunications Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/ICT02 Telecommunications Training Package/unit/ICTTC151A
Plan pit development
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCO1101A
Plan and monitor water management
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMMG506A
Design surface blasts
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNQOPS511A
Plan distribution and collection systems
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:NWP01 Water Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/NWP01 Water Industry Training Package/unit/NWP538A
Determine energy transfer loads
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:PMA02 Chemical, Hydrocarbons And Oil Refining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMA02 Chemical, Hydrocarbons And Oil Refining Training Package/unit/PMAOPS511A
Determine energy transfer loads
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMAOPS511A
Design surface blasts
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/MNQOPS511A
Develop LV switching schedule
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRIS09A
Develop and evaluate transmission switching programs
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO08A
Obtain other services related to operation of the system.
Operations and Maintenance | Operations Management | Plans Operations Work
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Detailed Planning & Scheduling methods
Operations and Maintenance | Operations Management | Schedules Operations Work
Heading:2. Production and Operations Management
Reference:Horselenberg M, R 2008, MMP - The PEMAC commitment to World Class Industry in Canada, Proceedings of Euromaint 2008, 8-10 April 2008, European Federation of National Maintenance Societies, Brussels, p
Scheme:Maintenance Management Professional (MMP)
Coordinate conveyor system shift
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCO1031A
Commission/recommission plant
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSU410A
Commission/recommission plant
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:PMA02 Chemical, Hydrocarbons And Oil Refining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMA02 Chemical, Hydrocarbons And Oil Refining Training Package/unit/PMASUP440A
Adjust schedule(s) to meet daily workplace requirements
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:SUG02 Sugar Milling Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/SUG02 Sugar Milling Training Package/unit/SUGTASD3A
Coordinate the Network/System
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS420A
Coordinate Local H.V. Networks
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS424A
Co-ordinate and Direct Switching Program
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS429A
Co-ordinate Electrical Energy Production
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS438A
Co-ordinate Power Generation
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UEP06 Electricity Supply Industry - Generation Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UEP06 Electricity Supply Industry - Generation Sector Training Package/unit/UEPOPS515A
Coordinate and direct switching schedules
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRIS11A
Coordinate LV distribution networks
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO09A
Coordinate HV distribution and sub transmission networks
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO10A
Coordinate LV distribution network demand
Operations and Maintenance | Operations Management | Supervises Operations Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRSO13A
Production issues and methods
Operations and Maintenance | Operations Management | Understands Operations Management Principles and Processes
Heading:2. Production and Operations Management
Reference:Horselenberg M, R 2008, MMP - The PEMAC commitment to World Class Industry in Canada, Proceedings of Euromaint 2008, 8-10 April 2008, European Federation of National Maintenance Societies, Brussels, p
Scheme:Maintenance Management Professional (MMP)
Quality control methods
Operations and Maintenance | Operations Management | Understands Quality Control Principles and Processes
Heading:2. Production and Operations Management
Reference:Horselenberg M, R 2008, MMP - The PEMAC commitment to World Class Industry in Canada, Proceedings of Euromaint 2008, 8-10 April 2008, European Federation of National Maintenance Societies, Brussels, p
Scheme:Maintenance Management Professional (MMP)