Competency Units in Discipline:

Systems Engineering

Acquire the enabling systems or services to be used during disposal of a system.
Systems Engineering | Create/Dispose | Allocates Resources to Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Procures material / resources
Systems Engineering | Construction | Allocates Resources to Construction Work
Heading:E6: Source and Estimate Materials
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Select and manage building and construction contractors
Systems Engineering | Construction | Allocates Resources to Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5005A
Issuer:National Training Information Service
Identify requirements for management strategies for verification and validation
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:Manage verification and validation processes
Reference:Government Skills Australia, Defence Materiel Logistics, http://www.governmentskills.com.au/content/view/665/
Scheme:Defence Materiel Logistics
Issuer:Defence Materiel Organisation
Review and analyse production trials and specify retrials
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMBTECH502A
Issuer:National Training Information Service
Review and analyse production trials and specify retrials
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMBTECH502A
Issuer:National Training Information Service
Assist with analysis of emerging technology
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:PSP04 Public Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PSP04 Public Sector Training Package/unit/ICAITS035C
Issuer:National Training Information Service
Assist with analysis and use of emerging technology
Systems Engineering | Concept Exploration and Validation | Analyses Concept Exploration Environment
Heading:SRC04 Community Recreation Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/SRC04 Community Recreation Industry Training Package/unit/SRXTCN001A
Issuer:National Training Information Service
Manage the implementation of decommissioning, disposal and risk control actions.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Deactivate the system to prepare it for removal from operation.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Withdraw operating staff from the system and record relevant operating knowledge.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Disassemble the system into manageable elements to facilitate its removal for reuse, recycling, reconditioning,~overhaul, archiving or destruction.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Remove the system from the operational environment for reuse, recycling, reconditioning, overhaul or~destruction.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Conduct destruction of the system, as necessary, to reduce the amount of waste treatment or to make the~waste easier to handle.
Systems Engineering | Create/Dispose | Applies Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Activate the system.
Systems Engineering | Commissioning | Applies Commissioning Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Review reliability of equipment and adjust reliability strategy
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:3.0 Equipment Reliability
Reference:SMRP M&R Knowledge Committee, Body of Knowledge Survey and Professional Development Worksheet, http://www.zoomerang.com/Survey/survey-intro.zgi?p=WEB2276UJHDAMY, Accessed 2/06/2008#http://SMRP M&R Kno
Link:N/A
Scheme:CMRP (Certified Maintenance and Reliability Professional)
Issuer:Society for Maintenance and Reliability Professionals
Make effective use of "lessons learned" information
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 3.3 Maintain Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Review asset performance and capacity against current requirements to identify proposals for rationalisation of asset
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 3.4 Asset Optimisation and Rationalisation
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Identify improvements to working practices and procedures
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.2 Assess and Manage Risks
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Identify and correct any failures to meet requirements
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.4 Audit and Review Compliance with Legal, Regulatory, Ethical and Social Requirements
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Identify reasons where requirements are not met and adjust policies and procedures accordingly
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Unit 5.4 Audit and Review Compliance with Legal, Regulatory, Ethical and Social Requirements
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Customer needs assessment
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:I. Reliability Management A. Strategic management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Identify and respond to problems and changes
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:Manage and monitor technical data and information systems
Reference:Government Skills Australia, Defence Materiel Logistics, http://www.governmentskills.com.au/content/view/665/
Scheme:Defence Materiel Logistics
Issuer:Defence Materiel Organisation
Identifies constraints on potential engineering and cultural issues with the proposed engineering solutions
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:C1: Engineering Practice
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Draws conclusions and makes recommendations
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E4B: Investigation and Reporting
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Identifies opportunities for new or improved processes and / or products
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Identifies the resources required for the R & D lines
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Initiates concept development
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Gains commitment to the R & D proposal
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
How to react to predictive alarms
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:6. Predictive Maintenance Management
Reference:Horselenberg M, R 2008, MMP - The PEMAC commitment to World Class Industry in Canada, Proceedings of Euromaint 2008, 8-10 April 2008, European Federation of National Maintenance Societies, Brussels, p
Scheme:Maintenance Management Professional (MMP)
Issuer:Plant Engineering and Maintenance Association of Canada
Analyze the integrity of the system requirements to ensure that each requirement, pairs of requirements or sets~of requirements possess overall integrity.
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:5.5.3 Requirements Analysis Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Determine the appropriate course of action when corrective action is required to remedy failings due to~changed need.
Systems Engineering | Concept Exploration and Validation | Applies Concept Exploration Processes and Procedures
Heading:5.5.10 Operation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Realize or adapt system elements using the implementation enabling systems and specified materials~according to the defined implementation procedures for hardware fabrication, software creation and/or
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.5 Implementation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Package the system element and store as appropriate.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.5 Implementation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Obtain integration enabling systems and specified materials according to the defined integration procedures.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Obtain system elements in accordance with agreed schedules.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Integrate system elements in accordance with applicable interface control descriptions and defined assembly~procedures, using the specified integration facilities.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Prepare the site of operation in accordance with installation requirements.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Deliver the system for installation at the correct location and time.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Install the system in its operational location and interfaced to its environment according to its system~specification.
Systems Engineering | Construction | Applies Construction Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Implements planning and design process
Systems Engineering | Design | Applies Design Processes and Procedures
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Reviews the design to achieve acceptance
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Validates design
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Design evaluation
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:I. Reliability Management B. Reliability program management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Assure that the system elements have been verified against acceptance criteria specified in an agreement.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Ensure that the enabling system for verification is available and associated facilities, equipment and operators~are prepared to conduct the verification.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Conduct verification to demonstrate compliance to the specified design requirements.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Demonstrate proper installation of the system.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Demonstrate the installed system is capable of delivering its required services.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Ensure that any operators, enabling system for validation and associated facilities are ready in order to conduct~validation.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Conduct validation to demonstrate conformance of services to stakeholder requirements.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
As appropriate to agreement terms or organizational objectives, conduct validation to isolate that part of the~system giving rise to a non-conformance.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Analyze, record and report validation data according to criteria defined in the validation strategy.
Systems Engineering | Design | Applies Design Verification and Validation Processes and Procedures
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Accelerated life tests (e.g., single-stress, multiple-stress, sequential stress)
Systems Engineering | Concept Exploration and Validation | Applies Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Qualification/demonstration testing (e.g., sequential tests, fixed-length tests)
Systems Engineering | Concept Exploration and Validation | Applies Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Ensures research is undertaken
Systems Engineering | Concept Exploration and Validation | Applies Research
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Collaborates in the commercialisation of research outcomes
Systems Engineering | Concept Exploration and Validation | Applies Research
Heading:E5: Research and Development and Commercialisation
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Requirements management
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:I. Reliability Management B. Reliability program management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Define the functional boundary of the system in terms of the behaviour and properties to be provided.
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:5.5.3 Requirements Analysis Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Define each function that the system is required to perform, how well the system, including its operators, is~required to perform that function, the conditions under which the system is to be capable
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:5.5.3 Requirements Analysis Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Analyze the resulting architectural design to establish design criteria for each element.
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Determine which system requirements are allocated to operators.
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Record the architectural design information.
Systems Engineering | Specification | Applies Specification Processes and Procedures
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Evaluate materials for multi-storey buildings
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6013A
Issuer:National Training Information Service
Evaluate services layout and connection methods for the planning of large building projects
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6017A
Issuer:National Training Information Service
Develops engineering solutions
Systems Engineering | Design | Applies Technical Design Methods
Heading:C1: Engineering Practice
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Interprets and scopes design requirements
Systems Engineering | Design | Applies Technical Design Methods
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Determines engineering requirements
Systems Engineering | Design | Applies Technical Design Methods
Heading:E3: Materials / Components / Systems
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Designs / develops materials / components / components / systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:E3: Materials / Components / Systems
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Defines processes to components / systems operation
Systems Engineering | Design | Applies Technical Design Methods
Heading:E3: Materials / Components / Systems
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Manages the uses of materials / components / systems within the outcomes of the project / operation
Systems Engineering | Design | Applies Technical Design Methods
Heading:E3: Materials / Components / Systems
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Manages the recovery, reuse and disposal of materials / components / systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:E3: Materials / Components / Systems
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Use factors
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development A. Reliability design techniques
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Stress-strength analysis
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development A. Reliability design techniques
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Tolerance and worst-case analyses
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development A. Reliability design techniques
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Robust-design approaches
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development A. Reliability design techniques
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Design for X (DFX)
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development A. Reliability design techniques
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Parts selection
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development B. Parts and systems management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Material selection and control
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development B. Parts and systems management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Derating methods and principles
Systems Engineering | Design | Applies Technical Design Methods
Heading:III. Reliability in Design and Development B. Parts and systems management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Availability tradeoffs
Systems Engineering | Design | Applies Technical Design Methods
Heading:VI. Maintainability and Availability A. Management strategies
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Supervise and apply quality standards to the selection of building and construction materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5004A
Issuer:National Training Information Service
Assess timber framed designs for one and two storey buildings
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV5012A
Issuer:National Training Information Service
Assess structural requirements for domestic scale buildings
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV5015A
Issuer:National Training Information Service
Assess the construction of buildings up to three (3) storeys
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV6001A
Issuer:National Training Information Service
Evaluate services layout and connection methods for residential and commercial buildings up to 3 storeys
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV6005A
Issuer:National Training Information Service
Assess structural requirements for buildings up to 3 storeys
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV6007A
Issuer:National Training Information Service
Design residential and domestic fire sprinkler systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCPFS4004A
Issuer:National Training Information Service
Establish the gas management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1111A
Issuer:National Training Information Service
Establish the gas drainage management plan
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1116A
Issuer:National Training Information Service
Establish the outburst management plan
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1121A
Issuer:National Training Information Service
Establish the mining method and strata management systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1131A
Issuer:National Training Information Service
Establish mine transport systems and production equipment
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1136A
Issuer:National Training Information Service
Establish mine services and infrastructure systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCU1141A
Issuer:National Training Information Service
Select and install quarry plant and equipment
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS504A
Issuer:National Training Information Service
Establish quarry development
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS600A
Issuer:National Training Information Service
Establish the water management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS602A
Issuer:National Training Information Service
Design processing plant
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS604A
Issuer:National Training Information Service
Establish waste and by-product management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS624A
Issuer:National Training Information Service
Establish the stockpile management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNQ03 Extractive Industries Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNQ03 Extractive Industries Training Package/unit/MNQOPS640A
Issuer:National Training Information Service
Prepare basic engineering drawing
Systems Engineering | Design | Applies Technical Design Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM09003B
Issuer:National Training Information Service
Select and test mechanical engineering materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM23061A
Issuer:National Training Information Service
Select and test mechatronic engineering materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM23062A
Issuer:National Training Information Service
Assist in the preparation of a basic workplace layout
Systems Engineering | Design | Applies Technical Design Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM30013A
Issuer:National Training Information Service
Select and test components for simple electronic switching and timing circuits
Systems Engineering | Design | Applies Technical Design Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM30026A
Issuer:National Training Information Service
Establish and maintain the mine electrical installations, reticulation and protection systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCG1090A
Issuer:National Training Information Service
Establish waste and by-product management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCO1120A
Issuer:National Training Information Service
Establish mine services system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCO1130A
Issuer:National Training Information Service
Establish the mine infrastructure and fixed plant systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCO1140A
Issuer:National Training Information Service
Redesign & develop modifications to apparatus & systems" circuits
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES701BA
Issuer:National Training Information Service
Redesign & develop modifications to apparatus & systems" circuits
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES701BA
Issuer:National Training Information Service
Redesign & develop modifications to apparatus & systems" circuits (Electronics)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES701CA
Issuer:National Training Information Service
Redesign & develop modifications to apparatus & systems" circuits (Instrumentation)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES701DA
Issuer:National Training Information Service
Redesign & develop modifications to apparatus & systems" circuits (Refrigeration & a/conditioning)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES701EA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Ex mixed)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705TA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Ex p)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705UA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Dip)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705VA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Ex n)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705WA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Ex i)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705XA
Issuer:National Training Information Service
Design & develop modifications to explosion-protected equipment (Ex e)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705YA
Issuer:National Training Information Service
Design and develop modifications to explosion protected equipment
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705ZA
Issuer:National Training Information Service
Design and develop modifications to explosion protected equipment
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES705ZA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Ex mixed)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707TA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Ex p)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707UA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Dip)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707VA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Ex n)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707WA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Ex i)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707XA
Issuer:National Training Information Service
Design electrical installations in hazardous areas (Ex e)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707YA
Issuer:National Training Information Service
Design electrical installations in hazardous areas
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707ZA
Issuer:National Training Information Service
Design electrical installations in hazardous areas
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES707ZA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Ex mixed)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708TA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Ex p)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708UA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Dip)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708VA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Ex n)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708WA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Ex i)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708XA
Issuer:National Training Information Service
Design explosion-protected electrical systems (Ex e)
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708YA
Issuer:National Training Information Service
Design explosion protected electrical systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708ZA
Issuer:National Training Information Service
Design explosion protected electrical systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES708ZA
Issuer:National Training Information Service
Select and install surface mine plant and equipment
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMMG504A
Issuer:National Training Information Service
Design stockpile formations and reclaiming systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMMG508A
Issuer:National Training Information Service
Develop, implement and maintain process control systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMMG509A
Issuer:National Training Information Service
Establish the mine infrastructure and fixed plant systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM618A
Issuer:National Training Information Service
Establish the mine water management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM621A
Issuer:National Training Information Service
Establish the stockpile management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM622A
Issuer:National Training Information Service
Establish waste and by-product management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM623A
Issuer:National Training Information Service
Establish surface product haulage and transport systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM629A
Issuer:National Training Information Service
Establish the ventilation management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM631A
Issuer:National Training Information Service
Establish ventilation management system
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM631B
Issuer:National Training Information Service
Establish underground product haulage and transport systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:MNM05 Metalliferous Mining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNM05 Metalliferous Mining Training Package/unit/MNMMSM632A
Issuer:National Training Information Service
Prepare basic engineering drawing
Systems Engineering | Design | Applies Technical Design Methods
Heading:MSA07 Manufacturing Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MSA07 Manufacturing Training Package/unit/MEM09003B
Issuer:National Training Information Service
Design distribution and collection systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:NWP01 Water Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/NWP01 Water Industry Training Package/unit/NWP539A
Issuer:National Training Information Service
Select and prepare materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMA02 Chemical, Hydrocarbons And Oil Refining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMA02 Chemical, Hydrocarbons And Oil Refining Training Package/unit/PMAOPS105A
Issuer:National Training Information Service
Select and prepare materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMA02 Chemical, Hydrocarbons And Oil Refining Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMA02 Chemical, Hydrocarbons And Oil Refining Training Package/unit/PMAOPS105B
Issuer:National Training Information Service
Design equipment and system modifications
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMB07 Plastics, Rubber and Cablemaking Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMB07 Plastics, Rubber and Cablemaking Training Package/unit/LMTEMGN06A
Issuer:National Training Information Service
Prepare basic engineering drawing
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMB07 Plastics, Rubber and Cablemaking Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMB07 Plastics, Rubber and Cablemaking Training Package/unit/MEM09003B
Issuer:National Training Information Service
Design equipment and system modifications
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/LMTEMGN06A
Issuer:National Training Information Service
Select and prepare materials
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMAOPS105B
Issuer:National Training Information Service
Design and prepare models, moulds and dies
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMCOPS420C
Issuer:National Training Information Service
Choose materials for an application
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMCOPS531A
Issuer:National Training Information Service
Design structural/mechanical components
Systems Engineering | Design | Applies Technical Design Methods
Heading:PMC04 Manufactured Mineral Products Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PMC04 Manufactured Mineral Products Training Package/unit/PMCOPS631B
Issuer:National Training Information Service
Design and manufacture glass apparatus and glass systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:PML04 Laboratory Operations Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PML04 Laboratory Operations Training Package/unit/PMLSCIG501B
Issuer:National Training Information Service
Prepare detailed design of rural roads
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC508A
Issuer:National Training Information Service
Prepare detailed design of urban roads
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC509A
Issuer:National Training Information Service
Prepare detailed design of busways
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC510A
Issuer:National Training Information Service
Prepare detailed design of motorways and interchanges
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC512A
Issuer:National Training Information Service
Prepare detailed design of rail civil infrastructure
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC513A
Issuer:National Training Information Service
Prepare detailed design of airfield civil works
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC515A
Issuer:National Training Information Service
Select pavement surfacing
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC525A
Issuer:National Training Information Service
Prepare detailed design of traffic signals
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC527A
Issuer:National Training Information Service
Prepare detailed design of traffic management systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC528A
Issuer:National Training Information Service
Prepare detailed design of underground services
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC529A
Issuer:National Training Information Service
Prepare detailed design of surface drainage
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC530A
Issuer:National Training Information Service
Prepare detailed design of subsurface drainage
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC531A
Issuer:National Training Information Service
Prepare detailed design of tunnels
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC532A
Issuer:National Training Information Service
Prepare detailed design of civil concrete structures
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC533A
Issuer:National Training Information Service
Prepare detailed design of civil steel structures
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC534A
Issuer:National Training Information Service
Prepare detailed design of civil timber structures
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC535A
Issuer:National Training Information Service
Prepare detailed design of civil masonry, crib and gabion structures
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC536A
Issuer:National Training Information Service
Prepare detailed design of marine structures civil works
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC537A
Issuer:National Training Information Service
Prepare detailed design of foundations
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC538A
Issuer:National Training Information Service
Prepare detailed design of canals
Systems Engineering | Design | Applies Technical Design Methods
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC542A
Issuer:National Training Information Service
Design overhead distribution systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS05A
Issuer:National Training Information Service
Design underground distribution systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS06A
Issuer:National Training Information Service
Design distribution substations
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS07A
Issuer:National Training Information Service
Design public lighting systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS08A
Issuer:National Training Information Service
Design zone substation modifications
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS14A
Issuer:National Training Information Service
Design customer substation
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS20A
Issuer:National Training Information Service
Design transmission, sub-transmission and zone substation buildings
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS22A
Issuer:National Training Information Service
Design transmission, sub-transmission and zone substation primary plant
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS23A
Issuer:National Training Information Service
Design transmission, sub-transmission and zone substation protection and control systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS24A
Issuer:National Training Information Service
Design transmission, sub-transmission and zone substation earthing
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS25A
Issuer:National Training Information Service
Design transmission, sub-transmission and zone substation civil and structural components
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS26A
Issuer:National Training Information Service
Design overhead transmission systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS27A
Issuer:National Training Information Service
Design underground transmission systems
Systems Engineering | Design | Applies Technical Design Methods
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS28A
Issuer:National Training Information Service
Determine whether hardware and software elements that satisfy the design and interface criteria are available~off-the-shelf.
Systems Engineering | Design | Applies Technical Design Methods
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Evaluate alternative design solutions, modelling them to a level of detail that permits comparison against the~specifications expressed in the system requirements and the performance, costs, time scal
Systems Engineering | Design | Applies Technical Design Methods
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Define and document the interfaces between system elements and at the system boundary with external~systems.
Systems Engineering | Design | Applies Technical Design Methods
Heading:5.5.4 Architectural Design Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Stress-strength analysis
Systems Engineering | Design | Applies Technical Design Methods
Heading:Analysis techniques for dependability
Reference:Standards Association of Australia 2003, Dependability managementPart 3.1: Application guide Analysis techniques for dependability Guide on methodology, (AS IEC 60300.3.1-2003), Standards Australia, N
Link:N/A
Scheme:AS IEC 60300.3.1
Issuer:Standards Australia
Part count predictions and part stress analysis
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:IV. Reliability Modeling and Predictions B. Reliability predictions
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Elements of a reliability test plan
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Types and applications of reliability testing
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Test environment considerations
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing A. Reliability test planning
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Step-stress testing (e.g., HALT)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Reliability growth testing (e.g., Duane, AMSAA, TAAF)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Software testing (e.g., white-box, fault-injection)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing B. Development testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Product reliability acceptance testing (PRAT)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Stress screening (e.g., ESS, HASS, burn-in tests)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Attribute testing (e.g., binomial, hypergeometric)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Degradation testing (e.g., Arrhenius)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Software testing (e.g., black-box, operational profile)
Systems Engineering | Concept Exploration and Validation | Designs Reliability Test Plans
Heading:V. Reliability Testing C. Product testing
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Manage well completion and abandonment
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:DRT03 Drilling Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/DRT03 Drilling Training Package/unit/DRTOG45B
Issuer:National Training Information Service
Communicate unavoidable constraints on the system design arising from the disposal strategy.
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Confirm that no detrimental health, safety, security and environmental factors exist following disposal.
Systems Engineering | Create/Dispose | Develops Asset Disposal Processes and Procedures
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Make sure assets are disposed of responsibly and ethically
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Define a disposal strategy for the system, to include each system element and any resulting waste products.
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
take account of the health, safety, security and privacy applicable to disposal~actions and to the long term condition of resulting physical material and information.
Systems Engineering | Create/Dispose | Develops Asset Disposal Strategies
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Identify risks in the commissioning process and assess their impact on current operations and AM activities.
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Develop complex testing & evaluation procedures (Computer systems)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES406AA
Issuer:National Training Information Service
Develop complex testing & evaluation procedures
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES406BA
Issuer:National Training Information Service
Develop complex testing & evaluation procedures
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES406BA
Issuer:National Training Information Service
Develop complex testing & evaluation procedures (Electronics)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES406CA
Issuer:National Training Information Service
Develop complex testing & evaluation procedures (Instrumentation)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES406DA
Issuer:National Training Information Service
Develop commissioning programs for apparatus & circuits (Computer systems)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES602AA
Issuer:National Training Information Service
Develop commissioning programs for apparatus & circuits
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES602BA
Issuer:National Training Information Service
Develop commissioning programs for apparatus & circuits
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES602BA
Issuer:National Training Information Service
Develop commissioning programs for apparatus & circuits (Electronics)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES602CA
Issuer:National Training Information Service
Develop commissioning programs for apparatus & circuits (Instrumentation)
Systems Engineering | Commissioning | Develops Commissioning Processes and Procedures
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES602DA
Issuer:National Training Information Service
Prepare a transition strategy.
Systems Engineering | Commissioning | Develops Commissioning Strategies
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Establish, maintain and review contract administration procedures and frameworks
Systems Engineering | Construction | Develops Construction Processes and Procedures
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6003A
Issuer:National Training Information Service
Develop, plan and implement an appropriate building or construction planning process
Systems Engineering | Construction | Develops Construction Processes and Procedures
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6009A
Issuer:National Training Information Service
Establish systems for the development and monitoring of building and construction costs
Systems Engineering | Construction | Develops Construction Processes and Procedures
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6011A
Issuer:National Training Information Service
Identify the constraints that the implementation strategy and implementation technology impose on the design~solution.
Systems Engineering | Construction | Develops Construction Processes and Procedures
Heading:5.5.5 Implementation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Identify the constraints on the design arising from the integration strategy.
Systems Engineering | Construction | Develops Construction Processes and Procedures
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Generate an implementation strategy.
Systems Engineering | Construction | Develops Construction Strategies
Heading:5.5.5 Implementation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Define an assembly sequence and strategy that minimizes system integration risks.
Systems Engineering | Construction | Develops Construction Strategies
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Develop and implement an appropriate estimating and tendering system
Systems Engineering | Design | Develops Design Processes and Procedures
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6008A
Issuer:National Training Information Service
Define a verification plan based on system requirements.
Systems Engineering | Design | Develops Design Verification and Validation Processes and Procedures
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Identify and communicate potential constraints on design decisions.
Systems Engineering | Design | Develops Design Verification and Validation Processes and Procedures
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Define criteria for identifying and evaluating investment options
Systems Engineering | Concept Exploration and Validation | Develops Investment Options Strategies
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Establishing specifications
Systems Engineering | Design | Documents Design
Heading:III. Reliability in Design and Development B. Parts and systems management
Reference:American Society For Quality, Certified Reliability Engineer (CRE), Body Of Knowledge
Scheme:Certified Reliability Engineer (CRE)
Issuer:American Society for Quality
Document designs
Systems Engineering | Design | Documents Design
Heading:AUM00 Automotive Industry Manufacturing Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/AUM00 Automotive Industry Manufacturing Training Package/unit/AUM3003A
Issuer:National Training Information Service
Prepare simple building sketches and drawings
Systems Engineering | Design | Documents Design
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4014A
Issuer:National Training Information Service
Prepare specifications for all construction works
Systems Engineering | Design | Documents Design
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4015A
Issuer:National Training Information Service
Prepare drawing for heritage works
Systems Engineering | Design | Documents Design
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4037A
Issuer:National Training Information Service
Prepare simple building sketches and drawings
Systems Engineering | Design | Documents Design
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCGBC4014A
Issuer:National Training Information Service
Prepare specifications for all construction works
Systems Engineering | Design | Documents Design
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCGBC4015A
Issuer:National Training Information Service
Prepare design drawings and specification for cable installation
Systems Engineering | Design | Documents Design
Heading:ICT02 Telecommunications Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/ICT02 Telecommunications Training Package/unit/ICTTC002C
Issuer:National Training Information Service
Represent mechanical engineering designs
Systems Engineering | Design | Documents Design
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM09141A
Issuer:National Training Information Service
Represent mechatronic engineering designs
Systems Engineering | Design | Documents Design
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM09142A
Issuer:National Training Information Service
Draft and layout an overhead distribution extension
Systems Engineering | Design | Documents Design
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS01A
Issuer:National Training Information Service
Draft and layout an underground distribution extension
Systems Engineering | Design | Documents Design
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS02A
Issuer:National Training Information Service
Draft and layout a street lighting system
Systems Engineering | Design | Documents Design
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS03A
Issuer:National Training Information Service
Draft and layout a distribution substation minor upgrade
Systems Engineering | Design | Documents Design
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS04A
Issuer:National Training Information Service
Implement management strategies for verification and validation
Systems Engineering | Design | Implements Strategies for Design Verification and Validation
Heading:Manage verification and validation processes
Reference:Government Skills Australia, Defence Materiel Logistics, http://www.governmentskills.com.au/content/view/665/
Scheme:Defence Materiel Logistics
Issuer:Defence Materiel Organisation
Record integration information in an appropriate database.
Systems Engineering | Commissioning | Maintains Commissioning Documentation
Heading:5.5.6 Integration Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Record the installation data, including the operational configuration, anomalies detected, actions taken and~lessons learned.
Systems Engineering | Commissioning | Maintains Commissioning Documentation
Heading:5.5.8 Transition Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Develop professional technical and legal reports on building and construction projects
Systems Engineering | Construction | Maintains Construction Documentation
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5013A
Issuer:National Training Information Service
Make available verification data on the system.
Systems Engineering | Design | Maintains Design Verification and Validation Documentation
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Analyze, record and report verification, discrepancy and corrective action information.
Systems Engineering | Design | Maintains Design Verification and Validation Documentation
Heading:5.5.7 Verification Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Make available validation data on the system according to legal, regulatory or product sector requirements.
Systems Engineering | Design | Maintains Design Verification and Validation Documentation
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Manage the processes for legal obligations of a building or construction contract
Systems Engineering | Construction | Manages Construction Contracts
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6004A
Issuer:National Training Information Service
Manage tender developments for major projects
Systems Engineering | Construction | Manages Construction Contracts
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6005A
Issuer:National Training Information Service
Select and prepare a construction contract
Systems Engineering | Construction | Manages Construction Contracts
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4003A
Issuer:National Training Information Service
Implement, monitor, rectify and report on contracts
Systems Engineering | Construction | Manages Construction Contracts
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/MNCG1081A
Issuer:National Training Information Service
Manage the procurement and acquisition of resources for building or construction projects
Systems Engineering | Construction | Manages Construction Projects
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6006A
Issuer:National Training Information Service
Manage and administer development of documentation for building or construction projects
Systems Engineering | Construction | Manages Construction Projects
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6012A
Issuer:National Training Information Service
Manage construction work/projects
Systems Engineering | Construction | Manages Construction Projects
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5010A
Issuer:National Training Information Service
Manage construction work/projects
Systems Engineering | Construction | Manages Construction Projects
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCGBC5010A
Issuer:National Training Information Service
Plan and design mechanical engineering projects
Systems Engineering | Construction | Manages Construction Projects
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM14061A
Issuer:National Training Information Service
Plan and design mechatronic engineering projects
Systems Engineering | Construction | Manages Construction Projects
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM14062A
Issuer:National Training Information Service
Coordinate & manage installation projects (Computer systems)
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606AA
Issuer:National Training Information Service
Co-ordinate & manage installation projects
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606BA
Issuer:National Training Information Service
Co-ordinate & manage installation projects
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606BA
Issuer:National Training Information Service
Coordinate & manage installation projects (Electronics)
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606CA
Issuer:National Training Information Service
Coordinate & manage installation projects (Instrumentation)
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606DA
Issuer:National Training Information Service
Coordinate & manage installation projects (Refrigeration & a/conditioning)
Systems Engineering | Construction | Manages Construction Projects
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES606EA
Issuer:National Training Information Service
Prepares and maintains the design process
Systems Engineering | Design | Manages Design Processes and Procedures
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Identify and plan decommissioning, disposal and risk control actions
Systems Engineering | Create/Dispose | Plans Asset Disposal Work
Heading:Unit 3.5 Renew or Dispose of Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Specify containment facilities, storage locations, inspection criteria and storage periods if the system is to be~stored.
Systems Engineering | Create/Dispose | Plans Asset Disposal Work
Heading:5.5.12 Disposal Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Plan, develop and implement building or construction, energy conservation and management practices and processes
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC6010A
Issuer:National Training Information Service
Defines requirements and sources for materials
Systems Engineering | Construction | Plans Construction Work
Heading:E6: Source and Estimate Materials
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Estimates material used
Systems Engineering | Construction | Plans Construction Work
Heading:E6: Source and Estimate Materials
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Prepares materials / components / systems for use in the project / operation
Systems Engineering | Construction | Plans Construction Work
Heading:E6: Source and Estimate Materials
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Plan and organise work
Systems Engineering | Construction | Plans Construction Work
Heading:BCC03 Civil Construction Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCC03 Civil Construction Industry Training Package/unit/BCCCM1003B
Issuer:National Training Information Service
Sign site survey
Systems Engineering | Construction | Plans Construction Work
Heading:BCF00 Off-Site Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCF00 Off-Site Construction Training Package/unit/BCF2008A
Issuer:National Training Information Service
Plan and organise work
Systems Engineering | Construction | Plans Construction Work
Heading:BCF00 Off-Site Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCF00 Off-Site Construction Training Package/unit/BCG1002A
Issuer:National Training Information Service
Plan building or construction work
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4007A
Issuer:National Training Information Service
Arrange resources and prepare for the building or construction project
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4017A
Issuer:National Training Information Service
Plan and undertake the site inspection and assessment of asbestos products and materials
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4023A
Issuer:National Training Information Service
Arrange building applications and approvals
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4026A
Issuer:National Training Information Service
Plan and organise work
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGCM1003B
Issuer:National Training Information Service
Assess the construction of domestic scale buildings
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV5001A
Issuer:National Training Information Service
Evaluate materials for construction of domestic scale buildings
Systems Engineering | Construction | Plans Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGSV5002A
Issuer:National Training Information Service
Arrange resources and prepare for the building or construction project
Systems Engineering | Construction | Plans Construction Work
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCGBC4017A
Issuer:National Training Information Service
Arrange building applications and approvals
Systems Engineering | Construction | Plans Construction Work
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCGBC4026A
Issuer:National Training Information Service
Estimate and cost work
Systems Engineering | Construction | Plans Construction Work
Heading:BCP03 Plumbing and Services Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCP03 Plumbing and Services Training Package/unit/BCPCM4002A
Issuer:National Training Information Service
Select and apply mechanical engineering methods, processes and construction techniques
Systems Engineering | Construction | Plans Construction Work
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM23071A
Issuer:National Training Information Service
Select and apply mechatronic engineering methods, processes and construction techniques
Systems Engineering | Construction | Plans Construction Work
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM23072A
Issuer:National Training Information Service
Plan and prepare for asset construction
Systems Engineering | Construction | Plans Construction Work
Heading:NWP01 Water Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/NWP01 Water Industry Training Package/unit/NWP526A
Issuer:National Training Information Service
Plan and co-ordinate installation
Systems Engineering | Construction | Plans Construction Work
Heading:PRS03 Asset Security Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PRS03 Asset Security Training Package/unit/PRSTS306A
Issuer:National Training Information Service
Prepare civil works bills of quantities
Systems Engineering | Construction | Plans Construction Work
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC504A
Issuer:National Training Information Service
Prepare civil works schedule of rates
Systems Engineering | Construction | Plans Construction Work
Heading:RII06 Civil Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/RII06 Civil Construction Training Package/unit/RIICC505A
Issuer:National Training Information Service
Prepare and manage detailed construction plans for electrical system infrastructure
Systems Engineering | Construction | Plans Construction Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRDS09A
Issuer:National Training Information Service
Prepare a validation plan.
Systems Engineering | Design | Plans Design Verification and Validation Work
Heading:5.5.9 Validation Process
Reference:Standards Association of Australia 2003, Systems engineering - System life cycle processes, (AS NZS 15288-2003), Standards Australia, North Sydney.
Link:N/A
Scheme:AS15288
Issuer:Standards Australia
Prepare and evaluate tender documentation
Systems Engineering | Construction | Prepares Construction Contracts
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4013A
Issuer:National Training Information Service
Draft legally binding documents
Systems Engineering | Construction | Prepares Construction Contracts
Heading:PUA00 Public Safety (Not All Units Available For Public Access) Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PUA00 Public Safety (Not All Units Available For Public Access) Training Package/unit/BSALPP502A
Issuer:National Training Information Service
Prepare design brief for construction works
Systems Engineering | Construction | Prepares Construction Reports
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4028A
Issuer:National Training Information Service
Identify and appraise investment options for achieving the AM Strategy
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Select investment options and develop business cases
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Decide between investment options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Develop investment plans
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 1.4 Identify and Appraise Investment Options and Plans
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Analyse and benchmark the costs and benefits of investment options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 2.5 Apply Whole Life Costing Principles
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Assess the costs, risks and benefits of competing asset creation and/or acquisition options
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Appraise and prioritise investment projects based on their total business impact.
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Prepare business cases which identify and compare the costs, benefits and risks of proposed solutions based on the AM Plan.
Systems Engineering | Concept Exploration and Validation | Prepares Investment Options Proposals
Heading:Unit 3.1 Create and Acquire Assets
Reference:Institute of Asset Management, V2.0 Asset Management Competence Requirements, 08/02/2008
Link:N/A
Scheme:V2.0 Asset Management Competence Requirements
Issuer:Institute of Asset Management
Prepares concept advice on latest
Systems Engineering | Design | Provides Specialist Advice on Design
Heading:C2: Engineering Planning and Design
Reference:Engineers Australia, Australian Engineering Competency Standards
Scheme:Australian Engineering Competency Standards (Professional Engineer)
Issuer:Engineers Australia
Select welding processes
Systems Engineering | Construction | Selects Construction Methods
Heading:MEM05 Metal and Engineering Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MEM05 Metal and Engineering Training Package/unit/MEM05051A
Issuer:National Training Information Service
Coordinate & manage commissioning processes (Computer systems)
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604AA
Issuer:National Training Information Service
Co-ordinate & manage commissioning processes
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604BA
Issuer:National Training Information Service
Co-ordinate & manage commissioning processes
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604BA
Issuer:National Training Information Service
Coordinate & manage commissioning processes (Electronics)
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604CA
Issuer:National Training Information Service
Coordinate & manage commissioning processes (Instrumentation)
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604DA
Issuer:National Training Information Service
Coordinate & manage commissioning processes (Refrigeration & a/conditioning)
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:MNC04 Coal Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/MNC04 Coal Training Package/unit/UTENES604EA
Issuer:National Training Information Service
Validate commissioning test data against performance documentation
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:PRM04 Asset Maintenance Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/PRM04 Asset Maintenance Training Package/unit/PRMFSSI07A
Issuer:National Training Information Service
Design testing and commissioning procedures for substation and field devices
Systems Engineering | Commissioning | Supervises Commissioning Work
Heading:UET06 Transmission, Distribution and Rail Sector Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/UET06 Transmission, Distribution and Rail Sector Training Package/unit/UETTDRTS04A
Issuer:National Training Information Service
Administer a construction contract
Systems Engineering | Construction | Supervises Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4016A
Issuer:National Training Information Service
Supervise tilt-up work
Systems Engineering | Construction | Supervises Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC4022A
Issuer:National Training Information Service
Supervise the planning of on-site medium-rise building or construction work
Systems Engineering | Construction | Supervises Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5003A
Issuer:National Training Information Service
Administer the legal obligations of a building or construction contract
Systems Engineering | Construction | Supervises Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5007A
Issuer:National Training Information Service
Manage building or construction, environmental management practices and processes
Systems Engineering | Construction | Supervises Construction Work
Heading:BCG03 General Construction Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/BCG03 General Construction Training Package/unit/BCGBC5011A
Issuer:National Training Information Service
Co-ordinate and monitor asset construction and maintenance
Systems Engineering | Construction | Supervises Construction Work
Heading:NWP01 Water Industry Training Package
Reference:NTIS database, http://www.ntis.gov.au
Scheme:http://www.ntis.gov.au/?/trainingpackage/NWP01 Water Industry Training Package/unit/NWP410A
Issuer:National Training Information Service